


Master Plan Location
The 108-arce South Alliston Master Plan is located in the Town of New Tecumseth, within Simcoe County.
Road Access
The Master Plan has access to Highway 400, a six lane controlled access freeway that serves traffic travelling between the Greater Toronto Area and the rest of Simcoe County.
Land Use
The Property is in close proximity to the existing urban boundary and are currently zoned for agricultural land uses.
Property size
(Total MP Acres)
(Total MP Acres)
108
acres
Status
Available
Land Use
Industrial