Master Plan Location

The 418-arce Pilot Sound North Master Plan is located in northeast  Edmonton,  within the Edmonton Energy and Technology Park (EETP) Area Structure Plan.  

Road Access

The Master Plan benefits from quick access to Anthony Henday Drive ring road (northeast segment opened in 2016), via a new interchange at 66th Street.

Land Use

Adopted in 2010, the EETP is a long term development plan for petrochemical, general industrial, manufacturing, logistics and related support industries. 

Project Availability

141-acre of the Master Plan is sold.

Property size
(Total MP Acres)
418 acres

Status
Available

Land Use
Industrial